Serving San Antonio and 11 surrounding TX cities · Mon–Sun: 6am–8pm CALL NOW: (210) 753-8986

Our Process

Our Prep-First Concrete Coating Process

A prep-first system designed for real longevity, not rushed installs. See exactly how CB1's 4-step epoxy flooring installation process delivers concrete coatings that actually last in San Antonio, TX.

  • 4 steps, zero shortcuts
  • 95% of failures start at prep
  • 10–15+ year lifespan
  • 1-Year all-inclusive warranty

Most concrete coating failures don’t start with bad epoxy — they start with skipped prep. That’s why every epoxy flooring installation process in San Antonio at CB1 Specialty Concrete follows the same disciplined, four-step system regardless of project size. Understanding how epoxy flooring is installed the right way is the best way to evaluate any contractor’s quote, and it’s exactly why we walk every client through our full concrete coating process in Texas before a single tool touches your slab. We follow a dedicated installation system so surface prep is never rushed and coatings bond properly to the concrete — producing stronger, longer-lasting floors built to handle everyday life in Texas homes and businesses.

The 4-Step System

From Request to Finished Floor

Every project, residential or commercial, follows this exact sequence — no steps skipped, no shortcuts taken.

1
Step 1

Request Your Quote

Send a quick form or give us a call, and we’ll confirm the details of your space, your timeline, and your goals for the project. No pressure, no obligation — just a conversation about what you’re trying to achieve.

2
Step 2

On-Site Measure & Plan

We inspect the slab in person, recommend the right coating system for your traffic, budget, and style, and provide a clear, no-pressure estimate. This is also when we identify any cracks, moisture issues, or damage that need to be addressed before installation.

3
Step 3

Prep-First Installation

We diamond grind or shot blast the surface, fill joints, repair cracks or damage as needed, then install your coating system with a premium finish. This is the step where 95% of competitors’ installs fail — we never rush it.

4
Step 4

Final Walkthrough & Ready to Use

We quality-check every detail, review care and maintenance steps with you, and hand off a floor that’s ready to enjoy — backed by our 1-year all-inclusive warranty covering adhesion, product failure, and craftsmanship.

Installation Timeline

How Long Does Installation Take?

Timeline varies based on project size and complexity — here’s what to expect for residential projects.

Small

300–500 sq ft

1–2 days. Typical for a single-car garage or small room.

Medium

500–1,000 sq ft

2–3 days. Typical for a two-car garage or basement.

Large

1,000+ sq ft

4 days. Typical for large residential spaces or multi-room projects.

Commercial

2,000–50,000+ sq ft

Varies significantly by size and complexity — scheduled to minimize business disruption.

What’s included: Day 1 is surface preparation (the critical step), Day 2 is coating application, and Day 3 (if needed) is a second coat and finishes. Additional coats or special effects may add a 4th day. The curing process takes 24–48 hours before the space can be used, though foot traffic is generally okay after 24 hours. We’ll confirm an exact timeline during your on-site consultation.

Why Most Contractors Get It Wrong

The Cheap Approach vs. the CB1 Approach

Prep-first isn’t a marketing line — it’s the difference between a floor that lasts 10–15 years and one that fails in 2–3.

The Cheap Approach (Most Contractors)

  • Cheap epoxy that fails: Single-component epoxy or low-grade materials. Sounds affordable until it peels, yellows, or fails in 2–3 years.
  • Skipped surface prep: This is where 95% of epoxy failures originate. Contractors rush prep to save time and money.
  • Contractors disappear: Once the work is done, good luck finding them if you have a problem.
  • Inconsistent quality: Each project is a gamble — uneven color, poor finishes, no consistency.

The Result: Thousands invested in a “flooring upgrade” that fails within years.

The Premium Approach (CB1)

  • Industrial-grade materials: The same two-component epoxy systems trusted in Fortune 500 warehouses, automotive shops, and hospitals — built to last 15+ years.
  • Meticulous surface preparation: Never rushed. We spend the time necessary to prepare your concrete perfectly.
  • Flawless finishes every time: Premium application by certified installers with 10+ years of experience.

The Result: A stunning floor that actually lasts — your investment protected.

Materials & Warranty

Built on Preparation. Backed by Performance.

Industrial-Grade Systems

We use the same two-component epoxy and polyaspartic systems trusted in Fortune 500 warehouses and hospitals — not big-box DIY kits.

Certified Installers

Every installer is certified in epoxy, polishing, and concrete coating systems, and trained personally by founder Christopher Burciaga.

1-Year All-Inclusive Warranty

Every CB1 project is backed by a warranty covering adhesion, product failure, and craftsmanship — a real guarantee, not fine-print loopholes.

FAQ

Installation Process Questions

How long does epoxy flooring installation take?

Residential projects typically run 1–4 days depending on size: 300–500 sq ft takes 1–2 days, 500–1,000 sq ft takes 2–3 days, and 1,000+ sq ft takes about 4 days. Commercial projects vary based on size and complexity. Curing takes 24–48 hours before full use, though foot traffic is usually fine after 24 hours.

What happens during surface preparation?

We diamond grind or shot blast the concrete, fill joints, and repair cracks or damage as needed. This is the most important step in the entire process — it’s where 95% of competitors’ coating failures originate, so we never rush it.

What if my concrete is cracked or uneven?

Minor cracks (under 1/4 inch) are repaired and sealed before coating, usually included in the project. For significant damage or uneven surfaces, we recommend a concrete overlay — a thin layer of new concrete poured over the existing surface to create a perfect foundation.

Do I need to be home or on-site during installation?

Not for the full process, but we do walk you through the plan during Step 2 and complete a final walkthrough with you in Step 4 so you know exactly how to care for your new floor.

Is the process different for commercial projects?

The same 4-step system applies, but commercial timelines and scheduling are built around minimizing disruption to your business — including off-hours or weekend installation when needed.

Ready to Start Step 1?

Request your quote today and see exactly how our prep-first process can transform your concrete.

Scroll to Top